公车系强女奷校花雪柔,久久综合无码中文字幕无码,美女最大胆人体艺术,暖暖视频在线观看免费最新

您好,歡迎光臨萊州聚峰機(jī)械有限公司官方網(wǎng)站!

服務(wù)熱線

400-879-1999

你所在位置: 首頁 >> 新聞資訊 > 行業(yè)資訊
行業(yè)資訊

混凝土攪拌車的調(diào)試條件和維護(hù)

來源:http://www.mothernature2u.com/ 時(shí)間:2022-07-06

混凝土攪拌車廣泛用于基礎(chǔ)、灌樁、樓板、路面、場(chǎng)坪、護(hù)坡、溝渠、河道、橋梁、涵洞、隧道、中小型水庫等中小型工程。為了更好的使用設(shè)備,用戶們?cè)谫徺I設(shè)備時(shí)必須要對(duì)企業(yè)的產(chǎn)品性能、質(zhì)量及服務(wù)作深入了解,才會(huì)免除后顧之憂,那么用戶們?cè)隍?yàn)收混凝土攪拌,那么設(shè)備調(diào)試時(shí)必須具備以下條件:
Concrete mixers are widely used in small and medium-sized projects such as foundations, grouting piles, floors, pavements, yards, revetments, ditches, rivers, bridges, culverts, tunnels, small and medium-sized reservoirs, etc. In order to better use the equipment, users must have an in-depth understanding of the product performance, quality and service of the enterprise when purchasing the equipment, so as to avoid worries at home. Then users must have the following conditions when accepting concrete mixing, and the equipment commissioning:
1、需調(diào)試設(shè)備各部件、附件及隨機(jī)東西應(yīng)按標(biāo)準(zhǔn)裝備齊全。
1. All parts, accessories and accompanying items of the equipment to be commissioned shall be fully equipped according to the standard.
2、備好液壓油和潤(rùn)滑油脂,液壓油的油質(zhì)應(yīng)符合要求。
2. Prepare hydraulic oil and lubricating grease, and the oil quality of hydraulic oil should meet the requirements.
3、按規(guī)定加注液壓油、燃油、潤(rùn)滑油和冷卻水,且液壓油加至規(guī)定油面。
3. Fill hydraulic oil, fuel oil, lubricating oil and cooling water as required, and add hydraulic oil to the specified oil level.
4、應(yīng)對(duì)混凝土泵進(jìn)行檢查、調(diào)試和試運(yùn)轉(zhuǎn),使之進(jìn)入正常作業(yè)狀況,液壓體系調(diào)試后應(yīng)符合標(biāo)準(zhǔn)。
4. The concrete pump shall be inspected, debugged and test run to make it enter the normal operation condition. The hydraulic system shall meet the standard after debugging.
5、調(diào)試用混凝土攪拌車管管路管徑為125。
5. The pipe diameter of concrete mixer truck for commissioning is 125.
6、實(shí)驗(yàn)混凝土應(yīng)符合標(biāo)準(zhǔn)。
6. The experimental concrete shall meet the standard.
7、設(shè)備應(yīng)安放在平整堅(jiān)實(shí)的地面上。用戶們除了對(duì)在購買產(chǎn)品時(shí)需嚴(yán)格檢驗(yàn)以外,其實(shí)在日常保養(yǎng)問題上也是不可缺少的必要工作,這樣才能達(dá)到在操作過程中使用輕松且使用壽命更長(zhǎng)的理想效果。
7. The equipment shall be placed on a flat and solid ground. In addition to strict inspection when purchasing products, users are also indispensable and necessary work in daily maintenance, so as to achieve the ideal effect of easy use and longer service life in the process of operation.
混凝土攪拌車
此外平常的維護(hù)保養(yǎng)工作也要做好,比如:
In addition, routine maintenance work should also be done well, such as:
1.攪拌車發(fā)動(dòng)機(jī)使用方法,電壓多少,頻率多少,才可以啟動(dòng)電機(jī)。啟動(dòng)電源,然后發(fā)動(dòng)柴油機(jī),怠速運(yùn)轉(zhuǎn)夏天5分鐘。冬天15分鐘后,升速至電壓400V,頻率50Hz。合上發(fā)電機(jī)空開
1. The motor can be started only after the use method, voltage and frequency of the mixer engine. Start the power supply, then start the diesel engine and idle for 5 minutes in summer. After 15 minutes in winter, speed up to 400V and 50Hz. Close the generator air switch
2.攪拌車調(diào)整切割環(huán)間隙,切割環(huán)間隙過大會(huì)導(dǎo)致堵S管和錐管。在料斗后方,有一個(gè)固定搖臂的大螺母,松開螺母鎖片,用扳手?jǐn)Q死,然后再退回四分之一圈。裝好鎖片即可。
2. The mixer adjusts the clearance of the cutting ring, and the excessive clearance of the cutting ring will lead to the blockage of S pipe and cone pipe. At the back of the hopper, there is a big nut to fix the rocker arm. Loosen the nut lock, screw it with a wrench, and then return it for a quarter of a turn. Install the locking plate.
3.攪拌車潤(rùn)滑系統(tǒng)故障判斷,潤(rùn)滑系統(tǒng)堵死,會(huì)導(dǎo)致分配器閥芯不動(dòng)作,共有8個(gè)潤(rùn)滑點(diǎn),如果分配器不動(dòng)作,先檢查主進(jìn)油銅管是否暢通,不暢通則是潤(rùn)滑泵堵死。暢通則將8跟銅管依次拆掉,沒拆一根泵送7,8次,看分配器閥芯是否動(dòng)作。來判斷是哪一個(gè)潤(rùn)滑點(diǎn)堵死。
3. Judging the failure of the lubrication system of the mixer truck, if the lubrication system is blocked, the distributor valve core will not act. There are 8 lubrication points in total. If the distributor does not act, first check whether the main oil inlet copper pipe is unblocked. If it is not unblocked, the lubrication pump is blocked. If it is unblocked, remove 8 copper pipes in turn, and pump 7 or 8 times without removing one to see whether the valve core of the distributor acts. To determine which lubrication point is blocked.
以上就是問題解答的相關(guān)內(nèi)容了,希望能夠幫助到大家,如對(duì)這一問題還存在任何疑問,都?xì)g迎關(guān)注我們網(wǎng)站http://www.mothernature2u.com并咨詢我們的工作人員,將竭誠為您服務(wù)。
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website http://www.mothernature2u.com And consult our staff, will serve you wholeheartedly.
上一篇:全自動(dòng)攪拌車發(fā)動(dòng)機(jī)預(yù)熱前的檢查
下一篇:攪拌車運(yùn)輸車頻發(fā)交通事故之車輛本身因素
tag:混凝土攪拌車,小型混凝土攪拌車,全自動(dòng)混凝土攪拌車
當(dāng)前位置: 首頁 - 新聞資訊 > 行業(yè)資訊

混凝土攪拌車的調(diào)試條件和維護(hù)

作者:中科聚峰混凝土攪拌車廠家 時(shí)間:2022-07-06

混凝土攪拌車廣泛用于基礎(chǔ)、灌樁、樓板、路面、場(chǎng)坪、護(hù)坡、溝渠、河道、橋梁、涵洞、隧道、中小型水庫等中小型工程。為了更好的使用設(shè)備,用戶們?cè)谫徺I設(shè)備時(shí)必須要對(duì)企業(yè)的產(chǎn)品性能、質(zhì)量及服務(wù)作深入了解,才會(huì)免除后顧之憂,那么用戶們?cè)隍?yàn)收混凝土攪拌,那么設(shè)備調(diào)試時(shí)必須具備以下條件:
Concrete mixers are widely used in small and medium-sized projects such as foundations, grouting piles, floors, pavements, yards, revetments, ditches, rivers, bridges, culverts, tunnels, small and medium-sized reservoirs, etc. In order to better use the equipment, users must have an in-depth understanding of the product performance, quality and service of the enterprise when purchasing the equipment, so as to avoid worries at home. Then users must have the following conditions when accepting concrete mixing, and the equipment commissioning:
1、需調(diào)試設(shè)備各部件、附件及隨機(jī)東西應(yīng)按標(biāo)準(zhǔn)裝備齊全。
1. All parts, accessories and accompanying items of the equipment to be commissioned shall be fully equipped according to the standard.
2、備好液壓油和潤(rùn)滑油脂,液壓油的油質(zhì)應(yīng)符合要求。
2. Prepare hydraulic oil and lubricating grease, and the oil quality of hydraulic oil should meet the requirements.
3、按規(guī)定加注液壓油、燃油、潤(rùn)滑油和冷卻水,且液壓油加至規(guī)定油面。
3. Fill hydraulic oil, fuel oil, lubricating oil and cooling water as required, and add hydraulic oil to the specified oil level.
4、應(yīng)對(duì)混凝土泵進(jìn)行檢查、調(diào)試和試運(yùn)轉(zhuǎn),使之進(jìn)入正常作業(yè)狀況,液壓體系調(diào)試后應(yīng)符合標(biāo)準(zhǔn)。
4. The concrete pump shall be inspected, debugged and test run to make it enter the normal operation condition. The hydraulic system shall meet the standard after debugging.
5、調(diào)試用混凝土攪拌車管管路管徑為125。
5. The pipe diameter of concrete mixer truck for commissioning is 125.
6、實(shí)驗(yàn)混凝土應(yīng)符合標(biāo)準(zhǔn)。
6. The experimental concrete shall meet the standard.
7、設(shè)備應(yīng)安放在平整堅(jiān)實(shí)的地面上。用戶們除了對(duì)在購買產(chǎn)品時(shí)需嚴(yán)格檢驗(yàn)以外,其實(shí)在日常保養(yǎng)問題上也是不可缺少的必要工作,這樣才能達(dá)到在操作過程中使用輕松且使用壽命更長(zhǎng)的理想效果。
7. The equipment shall be placed on a flat and solid ground. In addition to strict inspection when purchasing products, users are also indispensable and necessary work in daily maintenance, so as to achieve the ideal effect of easy use and longer service life in the process of operation.
混凝土攪拌車
此外平常的維護(hù)保養(yǎng)工作也要做好,比如:
In addition, routine maintenance work should also be done well, such as:
1.攪拌車發(fā)動(dòng)機(jī)使用方法,電壓多少,頻率多少,才可以啟動(dòng)電機(jī)。啟動(dòng)電源,然后發(fā)動(dòng)柴油機(jī),怠速運(yùn)轉(zhuǎn)夏天5分鐘。冬天15分鐘后,升速至電壓400V,頻率50Hz。合上發(fā)電機(jī)空開
1. The motor can be started only after the use method, voltage and frequency of the mixer engine. Start the power supply, then start the diesel engine and idle for 5 minutes in summer. After 15 minutes in winter, speed up to 400V and 50Hz. Close the generator air switch
2.攪拌車調(diào)整切割環(huán)間隙,切割環(huán)間隙過大會(huì)導(dǎo)致堵S管和錐管。在料斗后方,有一個(gè)固定搖臂的大螺母,松開螺母鎖片,用扳手?jǐn)Q死,然后再退回四分之一圈。裝好鎖片即可。
2. The mixer adjusts the clearance of the cutting ring, and the excessive clearance of the cutting ring will lead to the blockage of S pipe and cone pipe. At the back of the hopper, there is a big nut to fix the rocker arm. Loosen the nut lock, screw it with a wrench, and then return it for a quarter of a turn. Install the locking plate.
3.攪拌車潤(rùn)滑系統(tǒng)故障判斷,潤(rùn)滑系統(tǒng)堵死,會(huì)導(dǎo)致分配器閥芯不動(dòng)作,共有8個(gè)潤(rùn)滑點(diǎn),如果分配器不動(dòng)作,先檢查主進(jìn)油銅管是否暢通,不暢通則是潤(rùn)滑泵堵死。暢通則將8跟銅管依次拆掉,沒拆一根泵送7,8次,看分配器閥芯是否動(dòng)作。來判斷是哪一個(gè)潤(rùn)滑點(diǎn)堵死。
3. Judging the failure of the lubrication system of the mixer truck, if the lubrication system is blocked, the distributor valve core will not act. There are 8 lubrication points in total. If the distributor does not act, first check whether the main oil inlet copper pipe is unblocked. If it is not unblocked, the lubrication pump is blocked. If it is unblocked, remove 8 copper pipes in turn, and pump 7 or 8 times without removing one to see whether the valve core of the distributor acts. To determine which lubrication point is blocked.
以上就是問題解答的相關(guān)內(nèi)容了,希望能夠幫助到大家,如對(duì)這一問題還存在任何疑問,都?xì)g迎關(guān)注我們網(wǎng)站http://www.mothernature2u.com并咨詢我們的工作人員,將竭誠為您服務(wù)。
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website http://www.mothernature2u.com And consult our staff, will serve you wholeheartedly.

截屏,微信識(shí)別二維碼