混凝土攪拌車更好攪拌需要從攪拌時(shí)間、攪拌速度、攪拌順序、攪拌容量和攪拌器結(jié)構(gòu)等方面來考慮,下面來進(jìn)行詳細(xì)的解答:
Better mixing by concrete mixer trucks requires consideration from aspects such as mixing time, mixing speed, mixing sequence, mixing capacity, and mixer structure. Here are detailed answers:
攪拌時(shí)間:攪拌車的攪拌時(shí)間應(yīng)該根據(jù)混凝土的種類和配合比來確定,一般來說,攪拌時(shí)間應(yīng)該在1-3分鐘之間,過長或過短的時(shí)間都會影響混凝土的質(zhì)量。
Mixing time: The mixing time of the mixer truck should be determined based on the type and mix ratio of concrete. Generally speaking, the mixing time should be between 1-3 minutes, and too long or too short a time can affect the quality of concrete.
攪拌速度:混凝土攪拌車的攪拌速度應(yīng)該根據(jù)混凝土的種類和配合比來確定,一般來說,攪拌速度應(yīng)該在2-6轉(zhuǎn)/分鐘之間,過快或過慢的速度都會影響混凝土的質(zhì)量。
Mixing speed: The mixing speed of a concrete mixer truck should be determined based on the type and mix ratio of concrete. Generally speaking, the mixing speed should be between 2-6 revolutions per minute. Too fast or too slow speed can affect the quality of concrete.
攪拌順序:攪拌車的攪拌順序應(yīng)該先將水和粉料攪拌均勻,再加入骨料進(jìn)行攪拌,很后再進(jìn)行一段時(shí)間的混合,以保證混凝土的質(zhì)量。
Mixing sequence: The mixing sequence of the mixer truck should first mix the water and powder evenly, then add the aggregate for mixing, and then mix for a period of time to ensure the quality of the concrete.
攪拌容量:攪拌車的攪拌容量應(yīng)該根據(jù)車輛的實(shí)際載重能力來確定,避免因?yàn)槌d而導(dǎo)致攪拌不均勻或者混凝土質(zhì)量下降。
Mixing capacity: The mixing capacity of the mixer truck should be determined based on the actual load capacity of the vehicle to avoid uneven mixing or degradation of concrete quality due to overloading.


攪拌器結(jié)構(gòu):混凝土攪拌車的攪拌器結(jié)構(gòu)應(yīng)該合理設(shè)計(jì),攪拌葉片應(yīng)該均勻分布,并且具有合適的形狀和角度,以保證混凝土的攪拌均勻。
Mixer structure: The mixer structure of the concrete mixer truck should be reasonably designed, and the mixing blades should be evenly distributed with appropriate shapes and angles to ensure uniform mixing of concrete.
此外混凝土攪拌車水箱的水量要經(jīng)常保持裝滿,以備急用,冬季停機(jī)后,應(yīng)將水箱、水泵、水管、攪拌筒內(nèi)的水放凈,并停放在朝陽、不積水的地方,以免凍壞機(jī)械。
In addition, the water volume in the water tank of the concrete mixer truck should always be kept full for emergency use. After shutdown in winter, the water in the water tank, water pump, water pipe, and mixing drum should be drained completely, and parked in a sunny place without accumulated water to avoid freezing and damaging the machinery.
在檢查、修理攪拌車液壓傳動部分時(shí),應(yīng)使發(fā)動機(jī)和液壓泵在沒有壓力的情況下進(jìn)行。在調(diào)整混凝土攪拌車各部間隙、行程、壓力時(shí),應(yīng)由專職安全員檢查同意;更換機(jī)件時(shí),必須由部長或主管經(jīng)理簽字,否則出現(xiàn)問題后追究有關(guān)人員責(zé)任。
When inspecting and repairing the hydraulic transmission part of the mixer truck, the engine and hydraulic pump should be operated without pressure. When adjusting the clearance, stroke, and pressure of each part of the concrete mixer truck, it should be checked and approved by a full-time safety officer; When replacing machine parts, it must be signed by the director or the manager in charge, otherwise the relevant personnel will be held responsible after any problems occur.
總之,只有在這些方面做到充分考慮和細(xì)致把握,才能確?;炷翑嚢柢嚨臄嚢栀|(zhì)量和穩(wěn)定性。您有需求就來我們網(wǎng)站http://www.mothernature2u.com咨詢!
In short, only by fully considering and carefully grasping these aspects can the mixing quality and stability of the concrete mixer truck be ensured. Come to our website if you have any needs http://www.mothernature2u.com consulting service