公车系强女奷校花雪柔,久久综合无码中文字幕无码,美女最大胆人体艺术,暖暖视频在线观看免费最新

您好,歡迎光臨萊州聚峰機(jī)械有限公司官方網(wǎng)站!

服務(wù)熱線

400-879-1999

你所在位置: 首頁 >> 新聞資訊 > 行業(yè)資訊
行業(yè)資訊

如何提高混凝土攪拌車的生產(chǎn)效率?

來源:http://www.mothernature2u.com/ 時(shí)間:2022-03-07

首先,混凝土攪拌車的選址應(yīng)根據(jù)其產(chǎn)量來確定,以保證原材料的儲(chǔ)備能滿足施工需要。在購(gòu)買產(chǎn)品之前,您可以與制造商詳細(xì)溝通其占地面積,然后制定相應(yīng)的計(jì)劃。
Firstly, the site selection of concrete mixer truck should be determined according to its output, so as to ensure that the reserve of raw materials can meet the construction needs. Before purchasing products, you can communicate with the manufacturer about the floor area in detail, and then make corresponding plans.
后來,混凝土攪拌車的筒倉(cāng)分區(qū)是合理和標(biāo)準(zhǔn)的,筒倉(cāng)儲(chǔ)存應(yīng)滿足兩個(gè)連續(xù)的生產(chǎn)高峰的需要。砂石應(yīng)分區(qū)域存放,并按“等候區(qū)”和“合格區(qū)”設(shè)置。各區(qū)域應(yīng)根據(jù)不同的品種和規(guī)格用隔墻隔開,并設(shè)置或預(yù)留必要的沖洗或屏蔽設(shè)施。
Later, the silo zoning of concrete mixer truck was reasonable and standard, and the silo storage should meet the needs of two consecutive production peaks. Sand and gravel shall be stored in different areas and set according to "waiting area" and "qualified area". All areas shall be separated by partitions according to different varieties and specifications, and necessary flushing or shielding facilities shall be set or reserved.
其次,為了保證夏季混凝土進(jìn)入模板時(shí)的溫度,砂石要用牢固的腳手架遮擋,以達(dá)到遮陽、防雨、防塵等目的,并設(shè)置或預(yù)留夏季降溫和冬季保溫措施,確保混凝土溫度符合要求。
Secondly, in order to ensure the temperature when the concrete enters the formwork in summer, the sand and gravel shall be covered with a firm scaffold to achieve the purposes of shading, rainproof and dustproof, and the cooling measures in summer and thermal insulation measures in winter shall be set or reserved to ensure that the concrete temperature meets the requirements.
提高混凝土攪拌車效率的根本途徑是設(shè)備和人力的成熟,場(chǎng)地的標(biāo)準(zhǔn)化也非常重要,建立標(biāo)準(zhǔn)場(chǎng)地有助于節(jié)省運(yùn)輸時(shí)間,提高整個(gè)混凝土攪拌車的工作效率。那么,用戶應(yīng)該如何規(guī)范場(chǎng)館呢?
The fundamental way to improve the efficiency of concrete mixer truck is the maturity of equipment and manpower. The standardization of site is also very important. The establishment of standard site will help to save transportation time and improve the work efficiency of the whole concrete mixer truck. So, how should users regulate venues?
混凝土攪拌車場(chǎng)地和道路必須進(jìn)行地基處理和表面硬化處理,以滿足重型車輛的交通要求。場(chǎng)地應(yīng)有完善的排水設(shè)施,排水通暢,無明顯積水或坑洼。現(xiàn)場(chǎng)檢查,需要清潔無灰塵,配備消防和*用電設(shè)施,懸掛各種*警示標(biāo)志,同時(shí)設(shè)置污水池和垃圾池,滿足環(huán)保要求。
The ground treatment and surface hardening treatment must be carried out for the site and road of concrete mixer to meet the traffic requirements of heavy vehicles. The site shall have perfect drainage facilities, with smooth drainage and no obvious ponding or potholes. During the on-site inspection, it is necessary to be clean and dust-free, equipped with fire-fighting and * power facilities, hang various * warning signs, and set up sewage tanks and garbage tanks to meet the requirements of environmental protection.
混凝土攪拌車生產(chǎn)效率有如下因素影響:
The production efficiency of concrete mixer truck is affected by the following factors:
1、混凝土攪拌車本身的可靠性和性能:要做好維護(hù)保養(yǎng),調(diào)試到各個(gè)部分相互匹配,避免意外停機(jī),就可以保證系統(tǒng)效率的基礎(chǔ)。
1. The reliability and performance of the concrete mixer truck itself: it is necessary to do a good job in maintenance and debugging until all parts match each other to avoid accidental shutdown, which can ensure the basis of system efficiency.
2、生產(chǎn)組織的合理性:不缺料等料,不等車;材料配比合理均衡,材料質(zhì)量符合要求,這是應(yīng)用層面保證效率的關(guān)鍵。
2. Rationality of production organization: no shortage of materials, no waiting for vehicles; The material ratio is reasonable and balanced, and the material quality meets the requirements, which is the key to ensure the efficiency at the application level.
3、場(chǎng)地管理和道路交通管理好:及時(shí)調(diào)度,疏通堵塞,是所有環(huán)節(jié)能正常工作,不相互影響。
3. Good site management and road traffic management: timely dispatch and unblock the congestion, so that all links can work normally without mutual influence.
上一篇:混凝土攪拌機(jī)生產(chǎn)一年能創(chuàng)造多少利潤(rùn)?
下一篇:攪拌車怎樣操作才能省油?
tag:混凝土攪拌車,小型混凝土攪拌車,全自動(dòng)混凝土攪拌車
當(dāng)前位置: 首頁 - 新聞資訊 > 行業(yè)資訊

如何提高混凝土攪拌車的生產(chǎn)效率?

作者:中科聚峰混凝土攪拌車廠家 時(shí)間:2022-03-07

首先,混凝土攪拌車的選址應(yīng)根據(jù)其產(chǎn)量來確定,以保證原材料的儲(chǔ)備能滿足施工需要。在購(gòu)買產(chǎn)品之前,您可以與制造商詳細(xì)溝通其占地面積,然后制定相應(yīng)的計(jì)劃。
Firstly, the site selection of concrete mixer truck should be determined according to its output, so as to ensure that the reserve of raw materials can meet the construction needs. Before purchasing products, you can communicate with the manufacturer about the floor area in detail, and then make corresponding plans.
后來,混凝土攪拌車的筒倉(cāng)分區(qū)是合理和標(biāo)準(zhǔn)的,筒倉(cāng)儲(chǔ)存應(yīng)滿足兩個(gè)連續(xù)的生產(chǎn)高峰的需要。砂石應(yīng)分區(qū)域存放,并按“等候區(qū)”和“合格區(qū)”設(shè)置。各區(qū)域應(yīng)根據(jù)不同的品種和規(guī)格用隔墻隔開,并設(shè)置或預(yù)留必要的沖洗或屏蔽設(shè)施。
Later, the silo zoning of concrete mixer truck was reasonable and standard, and the silo storage should meet the needs of two consecutive production peaks. Sand and gravel shall be stored in different areas and set according to "waiting area" and "qualified area". All areas shall be separated by partitions according to different varieties and specifications, and necessary flushing or shielding facilities shall be set or reserved.
其次,為了保證夏季混凝土進(jìn)入模板時(shí)的溫度,砂石要用牢固的腳手架遮擋,以達(dá)到遮陽、防雨、防塵等目的,并設(shè)置或預(yù)留夏季降溫和冬季保溫措施,確保混凝土溫度符合要求。
Secondly, in order to ensure the temperature when the concrete enters the formwork in summer, the sand and gravel shall be covered with a firm scaffold to achieve the purposes of shading, rainproof and dustproof, and the cooling measures in summer and thermal insulation measures in winter shall be set or reserved to ensure that the concrete temperature meets the requirements.
提高混凝土攪拌車效率的根本途徑是設(shè)備和人力的成熟,場(chǎng)地的標(biāo)準(zhǔn)化也非常重要,建立標(biāo)準(zhǔn)場(chǎng)地有助于節(jié)省運(yùn)輸時(shí)間,提高整個(gè)混凝土攪拌車的工作效率。那么,用戶應(yīng)該如何規(guī)范場(chǎng)館呢?
The fundamental way to improve the efficiency of concrete mixer truck is the maturity of equipment and manpower. The standardization of site is also very important. The establishment of standard site will help to save transportation time and improve the work efficiency of the whole concrete mixer truck. So, how should users regulate venues?
混凝土攪拌車場(chǎng)地和道路必須進(jìn)行地基處理和表面硬化處理,以滿足重型車輛的交通要求。場(chǎng)地應(yīng)有完善的排水設(shè)施,排水通暢,無明顯積水或坑洼?,F(xiàn)場(chǎng)檢查,需要清潔無灰塵,配備消防和*用電設(shè)施,懸掛各種*警示標(biāo)志,同時(shí)設(shè)置污水池和垃圾池,滿足環(huán)保要求。
The ground treatment and surface hardening treatment must be carried out for the site and road of concrete mixer to meet the traffic requirements of heavy vehicles. The site shall have perfect drainage facilities, with smooth drainage and no obvious ponding or potholes. During the on-site inspection, it is necessary to be clean and dust-free, equipped with fire-fighting and * power facilities, hang various * warning signs, and set up sewage tanks and garbage tanks to meet the requirements of environmental protection.
混凝土攪拌車生產(chǎn)效率有如下因素影響:
The production efficiency of concrete mixer truck is affected by the following factors:
1、混凝土攪拌車本身的可靠性和性能:要做好維護(hù)保養(yǎng),調(diào)試到各個(gè)部分相互匹配,避免意外停機(jī),就可以保證系統(tǒng)效率的基礎(chǔ)。
1. The reliability and performance of the concrete mixer truck itself: it is necessary to do a good job in maintenance and debugging until all parts match each other to avoid accidental shutdown, which can ensure the basis of system efficiency.
2、生產(chǎn)組織的合理性:不缺料等料,不等車;材料配比合理均衡,材料質(zhì)量符合要求,這是應(yīng)用層面保證效率的關(guān)鍵。
2. Rationality of production organization: no shortage of materials, no waiting for vehicles; The material ratio is reasonable and balanced, and the material quality meets the requirements, which is the key to ensure the efficiency at the application level.
3、場(chǎng)地管理和道路交通管理好:及時(shí)調(diào)度,疏通堵塞,是所有環(huán)節(jié)能正常工作,不相互影響。
3. Good site management and road traffic management: timely dispatch and unblock the congestion, so that all links can work normally without mutual influence.

截屏,微信識(shí)別二維碼